jobsite information by placing an x next to the appropriate description for
headings
|
|
|
B,
C, E and G. For A, D, and F use
correct number.
|
|
|
|
|
Prepared
for:
|
Date:
|
Prepared for:
|
City:
|
Date:
|
|
|
|
|
|
|
|
|
|
|
Use Tab Key
|
|
|
Machine Make & Model
|
|
Model
|
|
|
|
|
|
Bucket capacity
|
|
|
|
Bucket Size (c.y. heaped)
|
|
|
|
|
|
|
HOURLY PRODUCTION
|
Concrete
|
|
|
A. Average distance between
midpoint
|
|
|
Cubic Yards
|
|
|
of stockpiles and hopper (in feet)
|
|
|
|
|
|
|
Maximum production for peak
|
|
|
|
B.
Average Travel Speeds (Place an x in the appropriate cell)
|
periods. (Continuous cycling to
|
|
|
|
1st gear travel
|
|
hopper. No breaks, no
stockpiling
|
|
|
2nd gear travel (lower end)
|
|
and no other activities.)
|
|
|
2nd gear travel (higher end)
|
|
|
|
3rd gear travel (lower end)
|
|
Average production with 5 min.
|
|
|
|
3rd gear travel (higher end)
|
|
break and normal stockpiling
|
|
|
|
|
|
and other activities.*
|
|
|
|
C.
Hopper (Place an x
in the appropriate cell)
|
|
|
|
Ground level fed
|
|
|
|
|
Elevated (fed from ramp)
|
|
DAILY PRODUCTION (8 hour day)
|
Concrete
|
|
|
|
|
|
Cubic Yards
|
|
|
D. For elevated hopper only:
|
|
|
|
|
Length of ramp (in feet)
|
|
Average production with 5 min./hr.
|
|
|
|
|
|
breaks and normal stockpiling
|
|
|
E. Angle of ramp (elevated hopper only) (Place an x in the appropriate cell)
|
and other activities.*
|
|
|
Less than 10 degrees
|
|
|
|
10 - 15 degrees
|
|
* Other activity may include
|
|
|
16 - 21 degrees
|
|
loading trucks, watering for
|
|
|
|
|
dust control, maintaining access
|
|
|
F.
Percent of time loader spends
|
|
road, clean-up, etc.
|
|
|
stockpiling and other activities
|
|
|
|
|
|
|
|
Optional: Production Required
|
Concrete
|
|
|
G. Loader operator must change conveyor
|
|
|
Cubic Yards
|
|
|
position when switching materials
|
|
|
|
|
|
Yes: x
No: Leave blank
|
|
Hourly production
required:
|
|
|
|
|
|
|
|
Bucket size required:
|
|
|
|
Optional:
|
|
(Takes into account 5 min/hr break,
|
|
|
|
Hourly concrete production
|
|
stockpiling and other activities not
|
|
|
|
required (in cubic yards)
|
|
related to cycling material to
|
|
|
|
|
hopper)
|
|
|
|
|
|
|
|
|
|
|
|